Challenges hindering industrialized wooden multi-story construction from a contractor's perspective: a case study from Finland
Kinnunen, Sakari; Annunen, Petteri; Kujala, Jaakko (2025-01-30)
Kinnunen, Sakari
Annunen, Petteri
Kujala, Jaakko
Emerald
30.01.2025
Kinnunen, S., Annunen, P. and Kujala, J. (2025), "Challenges hindering industrialized wooden multi-story construction from a contractor’s perspective: a case study from Finland", Smart and Sustainable Built Environment, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/SASBE-08-2024-0285.
https://creativecommons.org/licenses/by/4.0/
© 2025, Sakari Kinnunen, Petteri Annunen and Jaakko Kujala. Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode.
https://creativecommons.org/licenses/by/4.0/
© 2025, Sakari Kinnunen, Petteri Annunen and Jaakko Kujala. Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode.
https://creativecommons.org/licenses/by/4.0/
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:oulu-202504162725
https://urn.fi/URN:NBN:fi:oulu-202504162725
Tiivistelmä
Abstract
Purpose
Industrialized construction (IC) is growing globally as an alternative and supplemental construction concept. High expectations have been set for IC to solve existing problems in the industry and enhance productivity. This study aims to identify the most intriguing challenges hindering industrialized wooden multi-story construction (WMC) in the Finnish context from a contractor’s perspective.
Design/methodology/approach
Methodologically, this study was a qualitative, single-case study with an inductive approach. Data were collected through five semi-structured interviews and analyzed using NVivo software. Observations were coded and classified into 10 categories and finally synthesized into 3 themes.
Findings
The results revealed that industrialized WMC companies are generating many innovations, primarily occurring at the company level. However, shortages in product systems and operation models, such as concept inflexibility and insufficient design fidelity and quality control practices, hinder the progress of industrialization. The findings also indicate that within the pre-fabrication context, production capacity management and cash flow management are key control factors in industrialized WMC. Strong variation in regulatory interpretation by authorities creates a significant challenge for IC concept development and project management.
Originality/value
This study endorses the existing research findings, highlights a new perspective on challenges in IC and highlights the importance of increasing cooperation between companies engaged in industrialization measures, accelerating the development of individual companies and fostering a more appropriate industry structure.
Purpose
Industrialized construction (IC) is growing globally as an alternative and supplemental construction concept. High expectations have been set for IC to solve existing problems in the industry and enhance productivity. This study aims to identify the most intriguing challenges hindering industrialized wooden multi-story construction (WMC) in the Finnish context from a contractor’s perspective.
Design/methodology/approach
Methodologically, this study was a qualitative, single-case study with an inductive approach. Data were collected through five semi-structured interviews and analyzed using NVivo software. Observations were coded and classified into 10 categories and finally synthesized into 3 themes.
Findings
The results revealed that industrialized WMC companies are generating many innovations, primarily occurring at the company level. However, shortages in product systems and operation models, such as concept inflexibility and insufficient design fidelity and quality control practices, hinder the progress of industrialization. The findings also indicate that within the pre-fabrication context, production capacity management and cash flow management are key control factors in industrialized WMC. Strong variation in regulatory interpretation by authorities creates a significant challenge for IC concept development and project management.
Originality/value
This study endorses the existing research findings, highlights a new perspective on challenges in IC and highlights the importance of increasing cooperation between companies engaged in industrialization measures, accelerating the development of individual companies and fostering a more appropriate industry structure.